
MoTeC Sea-Doo 2010 Installation
Installation
The M400 Marine ECU replac
es the factory ECU on top of the engine.
Remove the factory ECU (three T25 Torx screws) and pre-
supplied mounting plate before the M400 ECU is fitted:
• Screw 4 supplied M6 Stainless nuts on the studs
protruding from the top of the mounting plate.
These serve as captive spacers. (see right)
• Invert the plate and ensure that the 3
rubber rings are seated on the rubber
bushes which are fed from the top side
of the plate. (see picture at right)
• Place the plate with rubber inserts
over the plastic mounting bracket
on the PWC.
• Firmly screw 2 x 6mm cap screws
with washers in the lower 2
positions, and 1 x countersunk
screw without washer in the central
position. Do not over tighten.
• Ensure that the rubber mat with
hole is mounted over the centre
countersunk screw.
• Fit the waterproof relay to the top right screw post
which protrudes from the mounting plate.
• Fit the M400 ECU and place the 2 stainless steel
brackets onto the 4 screw posts, after first fitting
the rubber trim strips to the underside of the
brackets.
• Secure the brackets (and relay) with 4 x M6
washers and 4 x M6 Nylock nuts.
21
es the factory ECU on top of the engine.
Comentarios a estos manuales