
52 Appendices
Output Test Function
To test if all outputs are correctly wired to the relevant injectors and coils, the
ECU Manager software has an output test function available
menu, click Test Outputs).
If
you would like to use this function in a Kawasaki installation
control pins must be physically grounded, by removing them from the M400
ECU plugs and jumping to ground.
1. Unplug the M400 ECU connectors.
2. Press the single white tab on the undersi
de of the plug until it clicks
to unlock the
pin locking plate from Connector A (white plastic inserts
in the plug),
3. Extract pins A01 (white 18AWG), A23 (o
(yellow 20AWG)
from the rear of the connector using firm pressure.
4. Press the
dual white tabs on the top side of the plug until it clicks
lock the pin locking plate,
5. Re-insert the ECU plugs into the M400.
6. When ready to power up the ECU and test
three wires to ground.
Once testing is completed, reverse the above procedure to
wires into the M400 connector.
MoTeC
To test if all outputs are correctly wired to the relevant injectors and coils, the
(on the Utilities
you would like to use this function in a Kawasaki installation
, three relay
control pins must be physically grounded, by removing them from the M400
de of the plug until it clicks
pin locking plate from Connector A (white plastic inserts
from the rear of the connector using firm pressure.
dual white tabs on the top side of the plug until it clicks
to
jumper all
-insert the three
Comentarios a estos manuales